A number of 48 piles with a diameter of 10 cm and a depth of 10 m were executed.
Injecting the building with cement injection after completing the execution of the piles, using Techno Flow S110 material to reduce shrinkage and increase fluidity, Techno Mix WP material to increase the voltage and prevent water permeability, and Techno Seal DM material to increase setting speed.
After completing the piling and injection works, the dowels were anchored using Techno Mix 165.