Demolition of specific areas in the mall’s ceilings.
Addition of beams, slabs, and a concrete staircase to the mall.
Reinforcement of ceilings using metal strips.
Creating a jacket for a column to increase its height from 3 meters to 7 meters dowels and column stirrups were anchored using Techno Epoxy 165.
Reinforcing the basement ceiling of the mall using a HEB 500 iron pipe to transfer the loads of the new column and redistribute them to the columns bearing the slabs.
Anchoring column on the ground floor.